CON2020 Concrete Forming

Intermediate · 1 credit · TMT - Trades, Manufacturing and Transportation

Description
Students develop knowledge and skills related to the preparation and construction of a concrete foundation.
Prerequisite
CON1010: Construction Tools & Materials
Parameters
Access to a building site and/or construction facility and to instruction from an individual with specialized training in carpentry.
Supporting courses
CON1070: Building Construction CON2010: Site Preparation

Outcomes The student will:

  • 1 list and describe factors that affect footing and wall design

    • 1.1 describe how soils are tested for:

      • 1.1.1 resistance to penetration

      • 1.1.2 shear resistance

      • 1.1.3 moisture content

    • 1.2 explain how soil, water and frost conditions affect the design and construction of a foundation as well as excavation and safety procedures

  • 2 identify and describe common forming materials and processes

    • 2.1 explain the purpose of a footing

    • 2.2 describe one or more common techniques to form footings, walls and piers

    • 2.3 describe methods of reinforcing a footing and wall section

    • 2.4 identify the parts of a typical concrete wall form

    • 2.5 explain the difference between box-sill and cast-in-place construction

    • 2.6 identify release agents and coatings used on forms

    • 2.7 describe types of cement and concrete mixers used in footing and wall systems

    • 2.8 describe factors that determine the size and strength of a footing and wall components

  • 3 apply concrete forming skills to assist in forming and placing a concrete foundation

    • 3.1 prepare a detailed list of materials and supplies to form a footing and wall

    • 3.2 calculate the volume of concrete required for a footing and wall component

    • 3.3 use the appropriate tools and materials to:

      • 3.3.1 construct a set of forms for a rectangular footing and wall section

      • 3.3.2 square level, align and brace

      • 3.3.3 place, consolidate and finish a concrete footing and wall section

      • 3.3.4 make provisions to attach a sill plate, if necessary

      • 3.3.5 seal walls below ground level and install weeping tile

      • 3.3.6 backfill, taking into account lateral pressure

  • 4 demonstrate basic competencies

    • 4.1 demonstrate fundamental skills to:

      • 4.1.1 communicate

      • 4.1.2 manage information

      • 4.1.3 use numbers

      • 4.1.4 think and solve problems

    • 4.2 demonstrate personal management skills to:

      • 4.2.1 demonstrate positive attitudes and behaviours

      • 4.2.2 be responsible

      • 4.2.3 be adaptable

      • 4.2.4 learn continuously

      • 4.2.5 work safely

    • 4.3 demonstrate teamwork skills to:

      • 4.3.1 work with others

      • 4.3.2 participate in projects and tasks

  • 5 identify possible life roles related to the skills and content of this cluster

    • 5.1 recognize and then analyze the opportunities and barriers in the immediate environment

    • 5.2 identify potential resources to minimize barriers and maximize opportunities

Program of Studies 2009. Source document, © Alberta Education.